站台设备资料翻译-中英对照

发布时间:2012-11-23      阅读次数:1419

站台设备资料翻译-中英对照

Platform equipments
1. 发车指示器的安装:Installation of the departure indicator;
1) 发车指示器安装在列车发车方向站台端头的站台吊顶的安装支架或站台面上的镀锌钢管立柱或墙上。发车指示器的安装位置应满足司机了望方便的要求。如果采用墙上或站台面上安装,应事先作好管线预留。Departure indicator shall be installed on the zinc-plated steel tube post or at the wall of the platform or on suspended ceiling of the platform of the departure direction. The installation site of departure indicator shall meet the requirements for the convenient of the vision of driver. If the indicator was installed on the wall or platform, it is required to reserve the area for pipeline in advance.
2) 安装前应定测安装位置,调查站台吊顶层内的综合管线的布置;Determine the installation site before installation; investigate the arrangement of comprehensive pipeline on suspended ceiling of platform;
3) 发车指示器在安装前逐个进行检测,工作正常方可安装;Departure indicator shall carry on a strict quality inspection before installation; before installation, the operators shall inspect the components of equipment and confirm they are in normal conditions;
4) 吊装方式、位置应符合设计规定;The hoisting method and position shall obverse the regulation of design;
5) 吊装部件应作防腐处理,采用不锈钢管连接显示屏;The hoisting components shall be treated with anticorrosive processing; adopt the stainless steel to connect the display screen;
6) 接配线的种类、防护、应符合设计规定;The types and protection of wiring accessories shall comply with the regulation of design;
7) 电源电缆与通信电缆同槽敷设时,电源电缆应采用钢管防护并可靠接地;The power cable shall adopt the steel tube to protect and reliable grounding in the installation of power cable and communication cable trough;
8) 电缆接头应有余量,电缆和电源线均应固定,并不得用插头承受电缆自重。The cable joints shall be left an appropriate cushion; the cables and power cables shall be regular, and it is prohibited to support the weight of cable with plug.
2. 车站站台紧急停车按钮箱、自动折返按钮箱的安装Installation of emergency stop button box and automatic turnaround button box;
1) 安装前应定测安装位置,配合站台装修在车站站台的构筑物内预留按钮箱及其布线的管线预留条件,并负责按钮箱的施工及安装。Determine the installation site before installation, cooperate with the location of the structures of station platform and reserved the position for the arrangement of button box and pipeline; responsible for the construction and installation of the button box.
2) 在安装前逐个进行站台紧急停车按钮、自动折返按钮箱检测,工作正常方可安装;Carry on the strict inspection of the emergency stop button and automatic turnaround button before installation; the operators shall inspect the equipment components and confirm they are in normal conditions;
3) 接配线的种类、防护、应符合设计规定;The types and protection of wiring accessories shall comply with the regulation of design;
4) 电缆接头应有余量,缆线及防护钢管应固定;The cable joints shall be left the appropriate cushion; the cables and protective steel tube shall be fixed;
供电与接地的安装,应符合设计规定。The installation of power supply and grounding shall comply with the regulation of design;